[ad_1]
India’s Chandrayaan-3, which launched on July 14 from the Satish Dhawan Space Centre Second Launch Pad in Sriharikota, is India’s second attempt to touch down on the Moon, following the last-minute failure of the Chandrayaan-2 mission. The GSLV Mark 3 launch vehicle, named ‘Bahubali’, carried the hopes and dreams of 140 crore Indians as it made a 3.84 lakh kilometer journey to the Moon, which took approximately 42 days. The propulsion module successfully separated from the lander module on August 17, and it will continue in its orbit, carrying out its own series of experiments. The Vikram lander, along with the Pragyan rover, started its descent towards the lunar surface, undergoing a series of manoeuvers such as deboosting, reverse thrusting, as well as various stages of landing, all carried out by the AI-powered Automatic Landing Sequence (ALS).
And now, the much-awaited moment has arrived – India’s Chandrayaan-3 has touched down on the far side of the Moon!
[ad_2]
Source link